Skip to main content
Uncategorized

Parisi Hired as Interior Designer for 3 Long Beach Projects

By June 6, 2017November 28th, 2018No Comments

SRG Long Beach Apartment Communities Underway

All three communities are adjacent to urban amenities, including restaurants, bars and shopping. Also within walking distance will be the Metro Blue Line, which provides a direct connection to downtown Los Angeles.

The communities offer striking and unique architecture complimenting each of the neighborhoods.  They also provide stylish interior and exterior amenities including courtyards with active dining and gaming, state-of-the-art fitness centers, rooftop decks, game rooms, bike rooms and pet amenities.  Apartments will offer contemporary finishes with modern kitchen and bath features, washers and dryers, recessed lighting, stainless steel appliances, and USB charging ports. All buildings will be LEED Certified, and are designed by Long Beach based architects Studio One Eleven.

The Alamitos. Located at 1st Street and Alamitos Avenue, The Alamitos will offer 136 apartment homes plus 2,500 square feet of ground-floor restaurant space, and six floors of apartments. The unit mix will consist of studios, and one- and two-bedroom floorplans, ranging from 660 square feet to 1,620 square feet. Construction began in May 2017 and will be completed in early 2019.

The Linden. The Linden, at 4th Street and Linden Avenue, will provide 49 apartment homes plus 2,500 square feet of ground-floor retail, along with five floors of apartments. The unit mix will be an even split of one and two bedroom apartments, ranging from 700 square feet to 1,570 square feet. Construction will begin in June 2017 and will be completed in early 2019.

The Pacific. The Pacific, at 3rd Street and Pacific Avenue, with 163 apartment homes, will have seven levels of apartments. The unit mix will include ground floor townhomes on all street frontages, and studios, one- and two-bedroom apartments.  Ten percent of the units (17) will be reserved for moderate income residents.  Construction will begin in July 2017 and will be completed in summer of 2019.

Why Choose Parisi

Our ultimate goals are to project the image of your brand, enhance your product, and attract targeted consumers. Parisi takes a uniquely personalized approach to servicing our clients, where you can rest assured that one of our executives or the owner will be in attendance at every meeting and presentation, and will personally be involved with your project, every step of the way.